X
Attn Customers: If your shipping costs are over $1,000, please submit a custom quote request and we’ll be happy to assist you.

Resource Hub

Hours:
8am – 5pm, Mon – Fri (CST)
Phone:
765-560-DURA (3872)
Email:
[email protected]

Ridge Cap Installation Guidelines

124 KB
149 downloads

Polycarbonate ridge caps should be installed on foamed polyethylene shaped top end-closures with fasteners installed at the valley of the panel’s corrugate pattern. This should be done on both sides of the ridge cap.

Download is available until [expire_date]
Polycarbonate Ridge Cap Installation Guide
Cart